Click to download the Full Case Study.   InQuik bridge installed by Landscape Solutions for Hills Shire Council: Approximately a third of the time to install versus regular bridge construction. Sydney Water provided land to The Hills Shire Council to allow the construction of new sporting fields in Beaumont Hills – Caddies Creek. The Landscape Solutions...

IMG_2272-scaled
UOW-5.10-54-scaled
UoW-Wgong

Contractor: JBG Contractors Abutments are 6ft high (to the underside of the deck) with a 2.3ft stepped backwall that has an open front face for integration with the deck panels. Each abutment is connected to 2 x Magnelis-clad wing walls that are 8.2ft high (to the top of the deck) and 9ft-long, angled at 45...

IMG_1319-1
Gundaroo-blinding-layer
Gundaroo-2

Client: All Homes private developer / land release within Yass County region Contractor: Lentrol Earth Moving & Ormond Civil InQuik 45ft x 34.5ft SM1600-rated Integral bridge  The bridge is a double lane bridge with a pedestrian walkway. The deck is supported on 2 x 34.5ft-long abutments, one of which is 6ft-high (to the underside of...

1.-Old-Bridge
2.-Fabrication
3.-Abutment-Install

Click to download the Full Case Study.     Byron Shire County deliver the “Bringing back the Brunswick” project by installing their second InQuik bridge. “Bringing back the Brunswick” is described as one of the most significant environmental projects ever undertaken in the Byron Shire, with County receiving grant funding from the NSW Department of Primary...

Merima-truck
Merima-abut-ins
Merima-deck-ins

Click to download the Full Case Study.   Snowy Monaro Regional Council bridge upgrades: Two InQuik bridges designed, built and open for traffic 10 months ahead of schedule. Council had identified 3 bridges that required replacement in the Bombala area, and successfully secured Stronger Communities Funds as part of this major project program. The projects had...

Durrum-abutment-install
Durrum-Deck-concrete
Durrum-Deck-install-1

Click to download the Full Case Study.   Byron Shire Council replaces a collapsed causeway with an InQuik Bridge: designed, built and open for traffic in just over 3 months.     Following severe under-scour during a flood, a fully laden garbage truck had collapsed Durrumbul Road Causeway, and whilst thankfully nobody was injured, it meant...

1.-Bellingen-old-bridge
2.-Bellingen-abutment-install
3.-Bellingen-deck-install

Click to download the Full Case Study.   InQuik bridge installed by Bellingen Shire Council: designed, built and open for traffic in 4 months, with 4 days on-site to install.     The single lane timber bridge over Reids Creek on Kalang Road was on an important transport route servicing school buses and farms, which became impacted...

Completed Bridge Boxers CK
Just-abutments
DSC_0013b-scaled

Boxers Creek Bridge The first InQuik bridge (pictured above) was successfully built in regional NSW near Goulburn. The project was a collaboration with world-class Australian companies SMEC, who undertook the engineering and design certification, and ARC, who supplied reinforcing steel and assembly in their Newcastle factory. The bridge is comprised of two 12m-span InQuik deck panels on InQuik...